First GBRf operated locos
66705, hired in due to the lack of available Fastline traction, waits time between the snow flurries and bursts of sunshine at Hatfield Colliery with the 13:05, 6A60 to Ratcliffe power Station. 18/12/09.
66705, hired in due to the lack of available Fastline traction, waits time between the snow flurries and bursts of sunshine at Hatfield Colliery with the 13:05, 6A60 to Ratcliffe power Station. 18/12/09.